SHEAR-CAV™ Systems

Advanced shearing and homogenization without gas injection.

To size your equipment
Pipe size, flow rate, line pressure at the unit, what the fluid must do, and the water source.

Performance Matrix

Advanced shearing and homogenization without gas injection.

Size Flow @ 30 PSI Flow @ 50 PSI Flow @ 100 PSI
1.0"23 GPM29 GPM38 GPM
1.5"55 GPM71 GPM98 GPM
2.0"93 GPM123 GPM165 GPM
3.0"208 GPM268 GPM365 GPM
4.0"365 GPM470 GPM643 GPM
6.0"833 GPM1075 GPM1465 GPM
8.0"1453 GPM1876 GPM2653 GPM
10.0"2285 GPM2950 GPM4172 GPM
12.0"3250 GPM4195 GPM5933 GPM

Scroll horizontally to compare columns.

General Specifications

  • Temperature:
    1°C - 60°C (33.8°F - 140°F)
    (Avoid freezing)
  • Working Pressure:
    Max 145 PSI (10 Bar)
  • Construction Material (Piping):
    Based on physicochemical fluid characteristics
    (e.g., PVC Sch 40/80 or Stainless Steel 316)
  • Solids Allowed:
    Up to ½ in solids (Strainer/Mesh filter recommended)
  • Gaskets:
    Viton
Installation Note: Install after batch delivery pump or in recirculation loop. Operates with a downstream pressure differential of 3-5 PSI (0.2 - 0.35 Bar).

Disclaimer: Specifications are for reference only; actual performance varies with fluid properties, operational parameters, and environmental conditions. For precise details, consult our technical team.

Kairospace SHEAR-CAV™ System
Specify This Unit

Shear and homogenize in line

Nine sizes from 1" to 12", 23 to 5933 GPM depending on line pressure, with no gas feed to plumb. To size one, we need these five things.

  • Pipe sizeNominal diameter and connection of the line.
  • FlowLine flow in GPM (or L/min), minimum to maximum.
  • Pressure at the injection pointLine pressure at the unit, in PSI (or bar).
  • What it must doWhat you need sheared, mixed or homogenized, and the fluid properties.
  • Water sourceWell, municipal, surface or process water, with temperature and any solids.

Values marked as reference on this page are confirmed by engineering in the quote.