Reading
Deployment

From site data to commissioned system.

No mystery, no months of disruption. Kairospace systems are drop-in hardware on your existing lines — here's exactly what happens, in what order, and who does what.

Timeline

What happens when

Week 0 · Sizing

Tell us your water source and what you want to change. We size it from your flow, pipe size and a water test. An engineer replies within 48 hours, with a proposal or with the questions we need to write one.

Weeks 1–6 · Engineering & Build

On confirmation, hardware is configured for your line. Typical lead time is 4–6 weeks from down payment to hardware on site.

Install · Days, Not Weeks

Injectors and cavitators tie into your existing piping in 1–3 days, with hours of interruption on the treated line, not days.

Ongoing · Optimization

Commissioning, operator training and DO/pH monitoring. Injectors and cavitators have no moving parts; pumps and oxygen generators are serviced every six months.

Responsibilities

Who does what

The split that has worked across our deployments. Simple on purpose.

Kairospace or your dealer provides

  • System design sized to your flow and goals
  • Hardware: injectors, cavitators, O₂ generation, sensors
  • Delivery, installation, and commissioning
  • Operator training on site
  • Warranty: 3 years on non-moving parts (piping, injectors, cavitators), 1 year on moving parts (pump, oxygen generator)
  • Service every six months and replacement parts

Your team provides

  • A dedicated GFCI-protected circuit, commonly about 220 V / 30 A (exact spec in your proposal)
  • Access to the water line or reservoir at the injection point
  • Basic site prep (a pad or mounting area for the skid)
  • An operator contact for training and checkpoints
  • On pilots: shared readings so the results report reflects reality
Ways to buy

Direct or through a dealer

Same hardware and the same warranty either way. What changes is who quotes, installs and services it.

Buying direct

  • Quote: a Kairospace engineer
  • Install and commissioning: Kairospace
  • Service: Kairospace
  • Warranty: 3 years on non-moving parts, 1 year on moving parts
  • Lease-to-own: 3–4 month terms, lease fees credited toward the purchase

Through your hydro store or dealer

  • Quote: your store or dealer, sized with Kairospace engineering
  • Install and commissioning: the dealer's certified technicians, or Kairospace where the dealer arranges it
  • Service: your dealer, with Kairospace parts and support
  • Warranty: the same, backed by Kairospace

Find the dealer that serves you

Project site

Your project, in one place

Every Kairospace project gets a private project site. Access is per project and by invitation — your team, the Kairospace team, and your local partner where one is assigned.

Milestones

Where the project stands, from scope to commissioning, and what comes next.

Documents to review and accept

Proposals and project documents in one place. You accept them on the site, and each acceptance is recorded with a timestamp.

Requests and messages

The questions we need you to answer to size and install the system, and a message thread for everything else.

Readings and maintenance

Once the system runs, readings are plotted against the bands agreed for your site, next to the maintenance schedule.

Next Step

Send us your line specs — get a quote back.

Flow rate, pipe diameter, water source, and what you're trying to change. That's all we need to start.

Get a quote